چار آپشن میں سے کسی ایک پر کلک کرنے سے جواب سرخ ہو جائے گا۔
آواز کی رفتار مندرجہ ذیل میں سے کس کے ذریعے زیادہ سے زیادہ ہے؟
- Glass
- Air
- Wood
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
The speed of sound depends on the medium's density and elasticity.
It travels fastest in solids (due to tightly packed molecules) and slowest in gases (like air).
Glass (Solid) – ~5,640 m/s
Water (Liquid) – ~1,480 m/s
Wood (Solid) – ~3,300–3,600 m/s
Air (Gas) – ~343 m/s
- 10 m
- 17.5 m
- 12.5 m
- 21.25 m
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
Let the height of the building be x meters.
Less lengthy shadow, Less in the height (Direct Proportion)
∴ 40.25 : 28.75 :: 17.5 : x ⇔ 40.25 × x = 28.75 × 17.5
x = 28.75 × 17.5/ 40.25 ⇒ x = 12.5
- 700
- 800
- 600
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
25% of x = 150
0.25x = 150
x = 150 / 0.25
x = 600
- 6
- 8
- 10
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
Let's solve:
3 men = 6 boys (given)
1 man = 2 boys
Work done by 3 men or 6 boys in 20 days:
Let's calculate work done by 1 boy in 1 day:
6 boys * 20 days = 120 boy-days
Now, 6 men and 8 boys:
6 men = 6 * 2 = 12 boys
Total = 12 boys + 8 boys = 20 boys
Time taken = 120 boy-days / 20 boys = 6 days
- 14
- 8
- 12
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
15 men complete the work in 8 days
Total work = 15 men * 8 days = 120 man-days
Now, to complete the work in 10 days:
120 man-days / 10 days = 12 men
- 370 men
- 360 men
- 380 men
- 410 men
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
1/240 * n * 4 = 6 becomes:
1/240 * 360 * 4 = 6
we simplify to get:
6 = 6 confirming that our calculation of the number of people required is good.
the answer is that it would require 360 men to fill 6 holes in 4 months.
- 114 men
- 140 men
- 180 men
- 160 men
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
If 40 men can build 4 buildings in 12 months we can divide 4/12 which is 1/3..
40*3 is 120 men for 4 buildings and 120 is divided into 4 we get 30 men for 1 building..
so for buildings 30*2 = 60
120+60 is = 180
- 52 1/2
- 60
- 61
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
105 men complete the work in 45 days
Total work = 105 men * 45 days = 4725 man-days
Now, 90 men will complete the work:
4725 man-days / 90 men = 52.5 days
- 40
- 50
- 61.25
- 80.50
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
Find how many man-days to complete the road:
70*35 = 2450 man-days
Let d = days required for 40 men to do it.
40d = 2450
d=402450=61.25
- 800
- 700
- 600
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
9% of x = 63
0.09x = 63
x = 63 / 0.09
x = 700