12 men can complete a piece of work in 4 days, while 15 women can complete the same work in 4 days. 6 men start working on the job, and after working for 2 days, all of them stopped working. How many women should be put on the job to complete the remaining work, if it is to be completed in 3 days?
  1. 15
  2. 19
  3. 23
  4. Data inadequate
Explanation

Work done by 12 men in 4 days = 1 (full work)

Work done by 1 man in 4 days = 1/12

Work done by 6 men in 4 days = 6/12 = 1/2 (i.e., half of the work)

Work done by 6 men in 2 days = (1/2) × (2/4) = 1/4

Remaining work = 1 - 1/4 = 3/4

15 women complete the full work in 4 days → 1 woman’s 1-day work = 1/(15 × 4) = 1/60

Work needed in 3 days → x women × 3 × (1/60) = 3/4

x = (3/4) × (60/3) = 15 women

Related MCQs

  1. 50 km/hour
  2. 100 km/hour
  3. 150 km/hour
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 3 hours 30 minutes, treating the speed change as extra delay.
  2. 3 hours 18 minutes, being 48 + 48 12 minutes plus 1 hour 30 minutes.
  3. 2 hours 48 minutes, using an overall average speed.
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 60 minutes
  2. 90 minutes
  3. 108 minutes
  4. 120 minutes
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 10 minutes
  2. 15 minutes
  3. 20 minutes
  4. 25 minutes
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 6
  2. 8
  3. 10
  4. 12
اس سوال کو وضاحت کے ساتھ پڑھیں