• Call Us : 03082533000 (WhatsApp)
  • Email Us : TestPointpk.com@gmail.com
Sticky Note
A can do a piece of work in 10 days; B in 15 days. They work for 5 days. The rest of the work was finished by C in 2 days. If they get Rs. 1500 for the whole work, the daily wages of B and C are:
  1. Rs. 160
  2. Rs. 255
  3. Rs. 225
  4. Rs. 350
Explanation
Step 1: Work Done by A and B Together
  • A’s 1-day work = 1/10
  • B’s 1-day work = 1/15
  • A and B’s 1-day work together:
  • Work done by A and B in 5 days:
Step 2: Work Left for C
  • Total work = 1
  • Work remaining after A and B worked for 5 days:
    1 - frac{5}{6} = frac{1}{6}
  • C completes the remaining 1/6 of the work in 2 days, so C’s 1-day work:
Step 3: Wages Calculation
  • Total amount = Rs. 1500

  • Work done ratio:

    • A's total work = 510=12frac{5}{10} = frac{1}{2}
    • B's total work = 515=13frac{5}{15} = frac{1}{3}
    • C's total work = 212=16frac{2}{12} = frac{1}{6}
  • Share of wages:

    • A's share = 12×1500=750frac{1}{2} times 1500 = 750
    • B's share = 13×1500=500frac{1}{3} times 1500 = 500
    • C's share = 16×1500=250frac{1}{6} times 1500 = 250
  • Daily wages:

    • B worked 5 days, so B’s daily wage = 500/5 = Rs. 100
    • C worked 2 days, so C’s daily wage = 250/2 = Rs. 125
    • 100+125 = 225

Related MCQs

  1. 50 km/hour
  2. 100 km/hour
  3. 150 km/hour
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 3 hours 30 minutes, treating the speed change as extra delay.
  2. 3 hours 18 minutes, being 48 + 48 12 minutes plus 1 hour 30 minutes.
  3. 2 hours 48 minutes, using an overall average speed.
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 60 minutes
  2. 90 minutes
  3. 108 minutes
  4. 120 minutes
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 10 minutes
  2. 15 minutes
  3. 20 minutes
  4. 25 minutes
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 6
  2. 8
  3. 10
  4. 12
اس سوال کو وضاحت کے ساتھ پڑھیں

All Rights Reserved © TestPointpk.com