If A and B together can complete a work in 18 days, A and C together in 12 days and B and C together in 9 days, then B alone can do the work in ____?
  1. 40 days
  2. 30 days
  3. 24 days
  4. 18 days
Explanation

Using the concept of work and rate, we can analyze the given information:

A+B = 1/18 (work done per day)

A+C = 1/12

B+C = 1/9

By adding the first two equations, we get:

(A+B) + (A+C) = 1/18 + 1/12

2A + (B+C) = 1/6

2A + 1/9 = 1/6

2A = 1/6 - 1/9

2A = 1/18

A = 1/36 (work done by A per day)

Now, we can find B's work per day:

B = 1/18 - 1/36 = 1/24

So, B alone can do the work in 24 days.

Related MCQs

  1. 360
  2. 3600
  3. 3600
  4. 540
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 320 km
  2. 340 km
  3. 360 km
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 10
  2. 11
  3. 12
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 7 m
  2. 10 m
  3. 14 m
  4. 22 m
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 1 hour
  2. 2 hours
  3. 3 hours
  4. 4 hours
اس سوال کو وضاحت کے ساتھ پڑھیں

All Rights Reserved © TestPointpk.com