Which camp zone should future planning actively avoid due to logistical vulnerabilities and geographic isolation?
لاجسٹک خطرات اور جغرافیائی تنہائی کی وجہ سے کیمپ زون میں مستقبل کی منصوبہ بندی سے فعال طور پر بچنا چاہیے؟
  1. Zone 6
  2. Zone 2
  3. Zone 4
  4. None of these
Explanation
  • Zone 6 should be actively avoided in future planning because of logistical vulnerabilities and geographic isolation.
  • Its location can create difficulties in transport, access, and operational coordination.
  • Future camp planning should prioritize locations with better accessibility and logistical support.
  • This recommendation aims to improve pilgrim facilitation and operational efficiency.

Last verified on 26-08-2026

Related MCQs

مجوزہ یونیفائیڈ پروسیس پر مبنی ڈیجیٹل مینجمنٹ سسٹم کا بنیادی اصول کیا ہے؟
  1. Separate systems for each operational wing
  2. Manual approval before every phase
  3. All operational phases linked sequentially, with each phase digitally closed before the next begins
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

بسوں کی مسلسل اور خودکار ٹریکنگ کے لیے کون سا ڈیجیٹل سسٹم تجویز کیا گیا؟
  1. Nusuk App
  2. Pak Hajj App
  3. M-HOMS integrated with GPS/E-tag location detection
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

بلڈنگ انسپیکشن ٹیم کو مکہ مکرمہ میں کب تک آپ کو دینا چاہیے؟
  1. 1st Ramadan
  2. 15th Shawwal
  3. 20th Zilhajj
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

مکہ مکرمہ کے لیے مجوزہ بلڈنگ انسپیکشن ٹیم میں کتنے ممبران شامل ہونے چاہئیں؟
  1. 10
  2. 11
  3. 12
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

مرکزی ٹرانسپورٹ کے مجوزہ انتظامات کے تحت تمام ٹرانسپورٹ گاڑیوں کو کس کے براہ راست کنٹرول میں رکھنا چاہیے؟
  1. Food Coordinator
  2. Sector Coordinator
  3. Central Logistics Officer
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں