Sticky Note
The man-hours required for dibbling are approximately?
ڈبّلنگ کے لیے تقریباً کتنے افرادی گھنٹے درکار ہوتے ہیں؟
  1. 150–200 man-hours
  2. 200–250 man-hours
  3. 250–300 man-hours
  4. None of these
Explanation
  • The man-hours required for dibbling are approximately 200–250 man-hours.
  • Dibbling is a method of sowing in which seeds are placed manually in holes at specific spacing and depth.
  • It requires considerable labour because workers make holes and place seeds individually.
  • The labour requirement varies with crop type, seed spacing, soil conditions, and workers’ efficiency.

Last verified on 16-10-2026

Related MCQs

  1. 17000 L/s
  2. 18000 L/s
  3. 19000 L/s
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

مٹی کی فیلڈ کیپیسٹی کن عوامل پر منحصر ہوتی ہے؟
  1. Porosity
  2. Capillary tension
  3. Both A and B
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 64.69
  2. 74.69
  3. 84.69
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

رِوٹس کے مراکز کو ملانے والی اور پلیٹ کے متوازی جانے والی لائن کو کیا کہتے ہیں؟
  1. Marginal pitch
  2. Gauge line
  3. Back pitch
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

فیلڈ کیپیسٹی اور مستقل مرجھانے کے نقطے کے درمیان موجود نمی کو کیا کہتے ہیں؟
  1. Unavailable water
  2. Gravitational water
  3. Available water
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں