PPSC Sub Civil Engineer interview experience Technical Question (all students) 2025
  1. انٹرویو میں پوچھے جانے والے سوالات
Explanation

TECHNICAL QUESTIONS — BUILDING SITE EXECUTION

  • What is the minimum curing period for concrete as per IS code?
  • What is the difference between M20 and M25 grade concrete? Which IS code governs mix design?
  • How do you ensure column verticality on-site during shuttering?
  • What is the lap length in reinforcement for tension and compression zones?
  • What are the steps you follow before starting PCC or RCC work at site?
  • What is the cover required for footings, columns, beams, and slabs?
  • What is the bar bending schedule? Can you prepare it?
  • What is honeycombing in concrete? How do you prevent it?
  • What is the purpose of stirrups in beams and columns?
  • What is the difference between one-way slab and two-way slab? How do you identify them?