To decrease water loss during transmission, a mega project for lining of water courses and canals was launched in 2004-05 with a cost of Rs. ______?
پانی کی ترسیل کے دوران نقصان کم کرنے کے لیے 2004-05 میں پانی کی نالیوں اور نہروں کی لائننگ کے لیے میگا پراجیکٹ شروع کیا گیا جس کی لاگت ______ روپے تھی۔
  1. 150 billion
  2. 66 billion
  3. 75 billion
  4. None of these
Explanation
  • In 2004, Pakistan launched the National Program for Improvement of Watercourses (NPIW).
  • Project cost: Rs. 66 billion (initial estimate).

Additional information:

  • The project covered approximately 86,000 watercourses across Pakistan.
  • Seepage and conveyance losses account for 40–50% of water loss before reaching crops.
  • Objective: Minimize water losses, improve irrigation efficiency, and support agriculture.

Last verified on 11-02-2026

Related MCQs

پاکستان کا مالی (فِسکل) سال کب سے شروع ہوتا ہے؟
  1. 1 July through 30 June
  2. 1 June through 30 July
  3. 1 August through 30 September
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

مندرجہ ذیل میں سے کون سا ذریعہ پاکستان کی برآمدات کو متنوع بنانے میں مدد دے سکتا ہے؟
  1. Transport Network
  2. BRI
  3. SEZs
  4. Tourism
اس سوال کو وضاحت کے ساتھ پڑھیں

کون سی تنظیم پاکستان جیسے ممالک کو مالی مدد فراہم کرتی ہے؟
  1. UNO
  2. IMF
  3. NATO
  4. OIC
اس سوال کو وضاحت کے ساتھ پڑھیں

پاکستان میں کون سا ادارہ ملک کے پانچ سالہ اقتصادی ترقیاتی منصوبے تیار کرتا ہے؟
  1. State Bank of Pakistan
  2. Planning Commission
  3. National Economic Council
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

ایک ملک کپڑے (کاٹن) کی بڑی مقدار میں اضافی پیداوار کرتا ہے اور اسے دوسرے ممالک کو فروخت کرتا ہے۔ یہ کس عمل کی مثال ہے؟
  1. Export
  2. Import
  3. Domestic trade
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں