PPSC PAST PAPERS MCQS 2004 TO 2020 OF BASIC MATHEMATICS
PPSC 20 years Subject
wise Past Papers
Click here
چار آپشن میں سے کسی ایک پر کلک کرنے سے جواب سرخ ہو جائے گا۔
- 128
- 256
- 64
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
To solve this, we need to multiply the two numbers:
2⁵ = 2 × 2 × 2 × 2 × 2 = 32
2³ = 2 × 2 × 2 = 8
Now, multiply them:
32 × 8 = 256
- 828m³
- 726m³
- 869m³
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
To solve this problem, we can calculate the rate at which the laborers dig the earth:
Rate = 805 cubic meters / (35 laborers × 5 hours)
= 805 / 175
= 4.6 cubic meters per laborer per hour
Now, we can calculate the amount of earth dug by 30 laborers in 6 hours:
Earth dug = 30 laborers × 6 hours × 4.6 cubic meters per laborer per hour
= 30 × 6 × 4.6
= 828 cubic meters
The correct answer is 828m³.
- 27 cubic inches
- 9 cubic inches
- 15 cubic inches
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
The volume of a cube is calculated by multiplying its width, length, and height:
Volume = width × length × height
= 3 × 3 × 3
= 27 cubic inches
- 280
- 290
- 285
- 300
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
If a month starts with Sunday, then the number of Sundays in that month is 5The remaining days is 30−5=25
Given that average number of visitors on Sundays is 510
Therefore, 510=5sum of the number of visitors on Sundays
⟹sum of the number of visitors on Sundays=510×5=2550 -----(1)
Given that average number of visitors on other days is 240
Therefore, 240=25sum of the number of visitors on other days
⟹sum of the number of visitors on other days=240×25=6000 -----(2)
Total average is 30total number of visitors=302550+6000=308550=285
Therefore, the average number of visitors per day in a month of 30 days beginning with a Sunday is 285.
- 58
- 61
- 59
- 60
- 57
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
Amount of work done by A and B in 1 day = 1/30
Amount of work done by A and B in 20 days = 20 × (1/30) = 20/30 = 2/3
Remaining work – 1 – 2/3 = 1/3
A completes 1/3 work in 20 days
Amount of work A can do in 1 day = (1/3)/20 = 1/60
=> A can complete the work in 60 days
- 6.2%
- 6.3%
- 6.4%
- 6%
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
Investment at 5%: Rs. 4000 x 5% = Rs. 200 per year
Investment at 4%: Rs. 3500 x 4% = Rs. 140 per year
Total income so far: Rs. 200 + Rs. 140 = Rs. 340 per year
Shortfall: Rs. 500 (desired income) - Rs. 340 (current income) = Rs. 160 per year
Amount to invest: Rs. 2500 (remaining amount)
Rate of interest required: (Rs. 160 / Rs. 2500) x 100% ≈ 6.4%
So, the correct answer is: 6.4%
- 84
- 82
- 88
- 86
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
60 (English) + 50 (Physics) + 90 (Economics) = 200
Total marks possible so far = 3 x 100 = 300
Now, let's calculate the total marks required to get 72% overall:
Total marks required = 72% of (300 + 100) (assuming Math's paper has 100 marks)
= 0.72 x 400
= 288
Now, let's subtract the marks already obtained from the total marks required:
288 - 200 = 88
So, the student needs 88 marks in Math's to obtain overall 72% marks.
- 6
- 8
- 2
- 4
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
To find the value of x^2, we need to square the value of x:
x^2 = (2)^2
= 2 × 2
= 4
So, the correct answer is: 4
- 20%
- 28%
- 12%
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
Let's assume the original price is $100.
Maria bought it at 20% discount: $100 - 20% = $80
She sold it with a 40% increase: $80 + 40% = $112
Profit = Selling price - Original price = $112 - $100 = $12
Percentage profit = (Profit / Original price) x 100 = ($12 / $100) x 100 = 12%
The correct answer is 12%.
- 27
- 14
- 16
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
To simplify the expression, follow the order of operations:
37 - [5 + {28 - (19 - 7)}]
= 37 - [5 + {28 - 12}]
= 37 - [5 + 16]
= 37 - 21
= 16